Legionella Ready

How it works

Build it once.
Then time takes over.

Six moves take the responsibility out of folders and put it onto the building.

1

Map the real building

Name the site, its buildings, floors, rooms and water assets. Floor strips grow from the rooms they contain.

2

Put responsibility in writing

Record the dutyholder, responsible person, operators and the limits of each role.

3

Set the controls

Choose the checks that fit the assessed system—temperature, flushing, cleaning, inspection and specialist work.

4

Do the work where it lives

Open the exact asset, follow its method and record the result, instrument, person, date and time.

5

Let time change the map

Green becomes amber as the next action approaches and red when action is required.

6

Keep permanent evidence

Every completion enters the logbook. History remains visible and can be opened, reviewed and exported.

Example education site
Building 1 of 2 · Monitor, act and record

Main teaching building

3 floors · 8 rooms · 14 outlets
Floor 12 rooms
Ground5 rooms
Outside1 room
Not activeCurrentDue soonAct now

When a box changes colour, tap it to see what it is and what needs doing. Hidden labels keep even large sites easy to read.

See the building. Do the work. Keep the proof.

The operational app is the product—not a separate spreadsheet or report generator.

Start Legionella Ready